RPS Fixed-Price Competitive Contract
Selected solar/wind projects can enter 20-year REC contracts with obligated suppliers under the KNREC framework.
Award eligibility · bid price · COD · gridSR KNOWLEDGE · KOREA–CHINA MARKET GUIDE
A practical guide to what documents matter at each stage, why they matter, and how investors assess project readiness.
SR Energy separates asset quality from revenue structure. Each live opportunity is screened for which revenue route is actually available, rather than assuming every project has the same tariff.
Selected solar/wind projects can enter 20-year REC contracts with obligated suppliers under the KNREC framework.
Award eligibility · bid price · COD · gridDirect or third-party PPA can link renewable generation to Korean corporate RE100 demand with privately negotiated tenor and price.
Offtaker credit · network charges · profile / basis riskOperating or uncontracted assets may retain exposure to wholesale SMP and REC market prices, subject to project eligibility and REC weighting.
Power price · REC price · curtailment · weightingNew renewable projects participate in the power market; eligible mechanism volume receives difference settlement against the mechanism price.
Province rules · mechanism volume · auction price · market exposureCHINA BENCHMARK · KOREA CONTRACT STRUCTURE
The two systems both reduce price uncertainty, but they work differently. China's mechanism price is a difference-settlement layer on market-traded electricity. Korea's fixed-price auction leads selected projects into long-term REC contracts with obligated suppliers.
Competitive auction; bid is based on SMP + REC structure.
New projects participate in the power market; mechanism price for eligible incremental projects is formed by provincial competitive bidding.
Selected generators contract with obligated suppliers; settlement follows the fixed-price contract formula.
For mechanism volume, the grid company settles the difference between market average price and mechanism price outside the market.
20 years for solar and wind under the current KNREC framework.
Province / technology specific. NEA reported a first-round national average of about 12 years across 28 provinces.
Only selected and contracted projects; eligibility and auction award are required.
Only the mechanism volume, not automatically 100% of project generation.
Potentially long-duration contracted cash flow, but not a government guarantee for every project.
Market exposure remains, with a price-settlement cushion on eligible mechanism volume.
China NEA reported an average mechanism price of about CNY 0.33/kWh and an average term of about 12 years across the first auctions in 28 provinces. This is a national snapshot, not a guaranteed tariff applicable to every project.
MARKET SIGNALS · 2026
216MW Jindo Green Solar MOU: partial equity investment + long-term PPA for AI/cloud data-center renewable power. Definitive terms are still under negotiation.
Korea Energy Agency's PPA intermediation platform opened on 20 Aug 2026, strengthening the infrastructure for renewable generators and corporate buyers to find PPA counterparties.
REC average KRW 78,831/MWh on 2 Sep 2026; mainland SMP average KRW 145.67/kWh on 31 Aug 2026. Snapshot only, not a return forecast.
SK and KKR are combining about 1.7GW of operating renewable capacity into an integrated platform targeting 10GW by 2031, illustrating a shift toward portfolio-scale capital and operations.
MARKET PROCESS · EVIDENCE GUIDE
Why it mattersVerify sponsor, ownership and control
Why it mattersVerify site boundary and overlap
Why it mattersTechnical basis for yield and bankability
Why it mattersVerify licensed capacity, site, period and holder
Why it mattersVerify connection point, capacity, voltage and date
Why it mattersDefine connection works, cost and responsibility
Why it mattersAssess acceptance and unresolved stakeholders
Why it mattersIdentify environmental conditions and schedule risk
Why it mattersVerify legal basis for offshore works and sea use
Why it mattersVerify approved technical, schedule, funding and mitigation plan
Why it mattersValidate turbine, foundation, cable and substation design
Why it mattersTest IRR, DSCR and financeability
Why it mattersVerify legal condition to start electrical works
Why it mattersVerify completion and safety before operation
Why it mattersVerify contractual revenue basis